Hi,
Iam having four operation in routing for a material
10-----In-house---------Material assigned to it
20----In-house--no material assigned to it
30-----PP02- sub contracted---- no material assigned to it
40----In-house---------no material assigned to it
is it possible to assign same raw material for diiferent operation(30,40)