I can see below table details in CM01
Week Requirements Available capacity CapLoad RemAvailalbe cap Unit
24/2014 320.72 120.00 267% 220.22- H
25/2014 77.86 168.00 46% 90.14 H
26/2014 25.17 168.00 15% 142.83 H
In week, 24/2014, available capacity 120, I want to know How it is being calculated?
In Week 25/2014 available capacity is 168, I want to know how it is being calculated?
In WorkCentre, capacity calculated as 1440 min ( Operating time 24 hours and capacity utilization is 100% so, capacity is 24*60= 1440 min)
I want to know How availbable capacity is calculated in CM01 based on workcentre capacity?